Wheel Excavator SZL150 Completes Order Production and Sets Off for Customer

2025/08/12 10:14

On August 11, 2025, the highly anticipated wheel excavator SZL150 has completed all customized production processes and is about to set off for the customer's location. This engineering equipment, which integrates a number of advanced technologies, will inject strong impetus into various construction scenarios.

The SZL150 wheel excavator has many outstanding features in performance. Equipped with a load-sensitive system and hydraulic oil brake device, it can easily adapt to all road conditions, whether it is a rough mountain road or a muddy site, and can move forward stably. To improve the operational stability, this model adopts a reinforced front push belt balancing oil cylinder plus hind-leg design, which greatly reduces the risk of shaking during operation and ensures high-precision construction requirements.

In terms of power and control, the SZL150 also performs excellently. The fully imported hydraulic system combined with full-time four-wheel drive enables the equipment to reach a driving speed of 28km/h, making efficient transfer no longer a problem. The hydraulic walking gearless torque output and flexible electronic shifting operation allow it to easily realize edge walking work, significantly improving construction efficiency.

It is worth mentioning that this model can be transported through a 40HQ container, saving about 70% of the freight compared with traditional transportation methods, which greatly reduces logistics costs. At the same time, the manufacturer also provides customized production services, which can accurately meet the personalized needs of special construction and bidding projects, and provide customers with more practical solutions.

As the departure whistle blows, the brand-new SZL150 wheel excavator slowly drives out of the factory area. With its efficient and flexible operation performance and reliable and durable mechanical quality, this equipment is about to join the main battlefield of engineering construction and inject strong momentum into various projects such as municipal construction and road repair.

未标题-4.jpg未标题-3.jpg

Related Products

x